Pipe-Watch Inc. | Alberta Pipeline Construction & Pipeline Integrity Testing

PIPE WATCH INC.

 

Phone: (780) 672 - 2800

 

 

Address:

P.O. Box 1808

Camrose Alberta,

T4V 1X7

This project involved the construction and installation of a new pig trap, including hydro testing and quality control.

 

Project Scope

 

• Take measurements of old trap.

• Build new trap to fit to kicker and MLV (main line valve) as well as having a bolt on tube turn door.

• Hydro test and document quality control for new pig barrel.

• Paint and prepare new trap as per specific requirements.

• Remove old pig trap and install new trap.

• Full reinstatement of line.

 

Project Outcomes

 

• Accommodate longer tools.

• All safety and environmental standards were held to the highest regard.

Copyright © 2016, Pipe-Watch Inc., all rights reserved.